Case: misplaced guide pins

The repair of a damaged windmill takes less time than expected

Challenge

During the construction of an offshore wind farm, a monopile as well as a transition piece are damaged due to misplaced guide pins.

Solution

Inspecto Visio maps out the damage and draws up a repair plan. Being aware that the flange cannot be welded, we decide – in consultation with the designer – to enlarge and fill the damaged hole, thus allowing the normal bolt to be fitted.

Result

Though a repair time of one and a half weeks is anticipated by the client, the proposed repairs are completed within just three days. As a result, the windmill is operational within the timeframe set by the subsidy provider.

Take away

To prevent damage to monopiles and transition pieces, we advise our client to research different ways to secure the guide pins.

Contact

Do you need our expertise or are you looking for more information? Please get in touch.

Fill in the contact form, call us or send an e-mail.

We will get back to you soon!

Hidden